Construction Phase

TITAN STUDENT UNION EXPANSION

The Titan Student Union (TSU) was originally built in 1976 and later expanded in 1992 to its current size of 140,000 square feet. While various space improvement projects have taken place over the years, no major expansion in the TSU has occurred in the past 20 years. The Titan Student Union Expansion project will establish a new focal point and entry for the building. The three-story (26,000 GSF) addition is located strategically on the southeast corner of the existing building and will provide supplemental public use space that is needed following significant student enrollment growth since the 1992 expansion.

Note: The video presentation represents the original schematic design that was submitted by the PCL/Steinberg design-build team. It does not accurately reflect all the changes or revisions that have been made during the design development phase.

[Construction Staging & Construction Parking Plans PDF File Opens in new window ] [Video Presentation]